Felchlin invests in the future
Last Friday, the ground breaking ceremony for our new freight forwarding building took place in the presence of senior management, the architect, site manager and representatives of the municipality of Schwyz.
The brand-new building will house a new production line for white couvertures, the forwarding department and a new raw materials and packaging warehouse. There will also be room for a new workshop and additional free capacity to further expand production. The total floor space will be in the vicinity of 5160 square metres.
In the picture gallery there are among other things, a visualisation of the planned building. It will be located between the existing production building and the new bridge over the river Muota.
We are not just happy about the additional space but are also undertaking a further and significant step towards making our production site more sustainable. The new building will be equipped with a photovoltaic system on the roof and inside the staircase a large hot water tank for the use of waste heat will complete the construction.
The starting point has now commenced and the building project should be fully operational in the autumn of 2025.